Just my .02 here but it seems that many folks get bogged down in carrying way too much bullshit up each pitch while aid climbing.
Minimize the cluster. On any pitch A2+ and easier, two yates adj. daisies, one set of ladder style aiders. Each daisy and each aider on their own keylock non-locking carbiner.
Get er done. Quit fucking around and move. Place your piece of gear. Clip daisy to highest point of gear (thumb loop on cam). Tighten adj daisy, bounce test with you waist, 1-3 times only (and only if it isn't bomber, otherwise don't bounce test, just move). If your gear holds a bounce test. Hang off your top daisy and move each aider up. Each aider carabiner gets clipped directly into the daisy biner on each side of the daisy (so your daisy doesn't move when you top step). Start moving up your ladders (get er done, second step minimum, top step preferably). When you waist gets near the lever of the gear clip the rope in. Repeat.