If they gonna jug, then have them jug the lead rope. Saves the swing, saves them trying to grab the draws form 15' away. That's how it's usually done on an aid route.
Otherwise, I add another vote in favour of the W Side variation.
I would have the 2nd aid the bolts on belay from above. If you give them tension as they do it, the whole thing will be over before you have time to think about the next lead.