Jump to content

squamish drytooling


mwalker

Recommended Posts

  • Replies 2
  • Created
  • Last Reply

Top Posters In This Topic

Popular Days

Top Posters In This Topic

yoda.gifthere is a rope set up for top rope on the left hand of the two drilled hole routes on the kacedemon.

 

On of the screw on holds broke last time I was up will be fixed by me by next weekend, Feel free to lap on the rope (always tie the ends together to inspect rope before climbing)

 

The right line is a bit of a peg board with one hard undercling section and the left is more powerful and technical until the angle straightens out then its pretty peggy. fruit.gif

 

temps are looking good in Lillooet for the upcoming week, hopefully will be out soon on something on the wet coast fruit.gif

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.




×
×
  • Create New...