Jump to content

Recommended Posts

Posted

During the end of August I climbed the North and South Twin Sisters. Our approach was the typical one from Mosquito Lake Rd, up FR 38, stopping at the bridge and walking up the quarry road. Well sometime in the last year the bridge failed an inspection and no more mining trucks can drive over the bridge. So They have re-built a new road and bridge up Blue Mtn. Rd. Anyway, to connect the old quarry road up to the Twin Sisters (west side) you follow the same route except now the road is graded and there is a bridge where you ford the creek. This makes the approach a bit faster, but there was a lot of traffic.

  • Replies 4
  • Created
  • Last Reply

Top Posters In This Topic

Posted

So are you saying that where you use to leave the quarry road and follow the old-starting-to-overgrow road towards the sisters, that road is now graded with a bridge over the shallow creek?

 

Anyone try driving up the Blue Mountain Road? Thats been gated forever......

  • 1 month later...
Posted

Yeah, where you use to leave the quarry road and follow the old-starting-to-overgrow road towards the sisters, that road is now graded with a bridge over the shallow creek.

 

(West of Mt Baker... oops)

 

  • 2 months later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.




×
×
  • Create New...