EWolfe Posted September 17, 2004 Share Posted September 17, 2004 FYI: I went Eastside on Tuesday evening, and was detoured at Money Creek to Skykomish. The going was slow, because not only is there that one-lane bridge, but there are a couple of construction zones along the detour as well. They are doing bolting on the cliffs just East of the Skykomish Tunnel. Same when I came back Thursday. Quote Link to comment Share on other sites More sharing options...
Dave_Schuldt Posted September 19, 2004 Share Posted September 19, 2004 (edited) Cool, that means they are fixing a realy bad section of hwy 2. http://www.wsdot.wa.gov/projects/US2_StevensPassWest/ Edited September 19, 2004 by Dave_Schuldt Quote Link to comment Share on other sites More sharing options...
lancegranite Posted September 19, 2004 Share Posted September 19, 2004 But what a nice drive! When driving by the Money creek campground, take notice of the beautiful information kiosks and USFS signs my father built. Quote Link to comment Share on other sites More sharing options...
MisterMo Posted September 19, 2004 Share Posted September 19, 2004 Cool, that means they are fixing a realy bad section of hwy 2. http://www.wsdot.wa.gov/projects/US2_StevensPassWest/ No just doing that chain-link rock catcher stuff. the highway will remain its twisty, windy, shady, two lane self. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.