Jump to content

Recommended Posts

Posted (edited)

to be accurate, you need to lead from base to be able to set up a TR.  once you lead it, TR as you please.

 

It is long pitch too so if you do TR, you will need a really really long rope (maybe 80m rope?)  or use 2 ropes.  either way expect a lot of rope stretch.

 

 

 

Edited by genepires

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...