As you may or may not know, the majority of the Army Corp of Engineers is civilian. Some of my coworkers are in Iraq acting as project managers in reconstruction efforts. This is a clip of news from this week:

 

"Mullah Success Continues. Twenty (20) megawatts of electricity, (17 MW derated) was added to the Iraqi power grid as the rehabilitated Mullah Seven Generator Unit at the Mullah Power Station was brought online June 2, 2004 in Mullah, Iraq, as announced by the Gulf Region Division of the U.S. Army Corps of Engineers. Additional days testing and verification of the restored turbine have been completed to confirm the operation of the generator. This is the second unit to be brought online in the last three weeks at Mullah."

 

The electricity infrastructure is more stable, and in better shape than before the war, with electricty available around 16-18 hrs a day compared to a typical 8-12 hrs before.

 

Hope we can the f-outta dodge soon.

  • Replies 2
  • Created
  • Last Reply

Top Posters In This Topic

Popular Days

Top Posters In This Topic

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.




×
×
  • Create New...