"2060

Clear Creek UNREACHABLE

Avalanche damage to road at mile 2, near Asbestos Creek, impassable beyond. Some avalanche debris in the road before the impassable damage. Use caution. Downed trees, snow, rocks and icy conditions likely.

 

49

Sloan Creek/North Fork Sauk INACCESSIBLE

Road washed out at MP 1.7, just past North Fork Sauk Falls Trailhead. Snow and icy conditions likely..

 

2040

Squire Creek UNKNOWN

Road damage has closed this road to all motorized vehicles 2 miles from trailhead. Major slide in 2002 took out the road about 3.5 miles from Darrington.

 

2000

Mt. Loop Scenic Hwy

Hwy 7 County

Mt. Loop Hwy – Verlot UNREACHABLE

Snohomish County closes the Mt. Loop Highway at Red Bridge milepost 18, seven miles east of the Verlot Public Service Center, while road crews work to stabilize the Silverton-Waldheim debris slide. This closure cuts off access from Granite Falls to the Deer Creek snow play area. Only residents are allowed past Red Bridge. The Darrington to Barlow Pass side of the Mt Loop is reported to have 4” of snow at Chokwich Creek, approximately 19 miles south of Darrington. Minor slumping and rocks are impacting the roadway in some areas, use caution. For more Snohomish County Road Updates"

 

Link to comment
Share on other sites

  • Replies 51
  • Created
  • Last Reply

Top Posters In This Topic

Wow!

Looks like some work parties are going to be in order in a big way come spring huh?

We should have a bash and get some of the Darrington regulars together.

 

On a side note, heard you were @ Index on Saturday. Smedley and I were on City Park confirming the fact that we are indeed the slowest and most pathetic aid climbers in history.

Link to comment
Share on other sites

After I heard about the washout on the Mt Loop I started thinking about those roads as well. Definetly going to have to take a look at what happened on FS 49, I don;t want to lose are access to Springy Spring. Regardless work parties are fun, thats why they are called parties!

Link to comment
Share on other sites

I went up to 2060 and 49 Saturday. 2060 is blown out 1.7 miles in down to a clay layer, 15 feet deep and 25 feet across, same spot as the 2003 damage. 3' diameter culvert is mostly exposed. Way worse shape than that year, it appears :(

 

We didn't hike the road further, but I would expect one of the remaining 4-6 prominent paths may have done some damage as well.

 

101_0518.JPG101_0514.JPG101_0515.JPG

 

FS 49 has a pretty good blowout at Pender's Canyon, just beyond NF Sauk Falls trail, shouldn't be too difficult to fix, even by a dedicated group of billhillies.

 

I'll see about contacts on who to write to, as our good folks in charge in previous years might have changed...

Link to comment
Share on other sites

2060 is blown out 1.7 miles in down to a clay layer, 15 feet deep and 25 feet across, same spot as the 2003 damage. 3' diameter culvert is mostly exposed. Way worse shape than that year, it appears :(

Bummer for sure. The scale of damage sounds way beyond what can be patched by a work party. Or for a small backhoe project that is probably all the FS could commit this season. Sounds like it might be a bike-in deal for a while?

 

Or a good year to get to know Spring and Squire better.

Link to comment
Share on other sites

I felt that solitude was standard fare for even 3 oclock rock. (when compared to the other usual suspect climbing areas) Now it will be practically deserted and become another static point.

 

Road to spring mtn has issues too. Road to squire is unknown also. Could be a long walk to anything with slabs for a while.

Link to comment
Share on other sites

I like the thought, but generally have never seen more than 6 or so cars at 3:00 rock trailhead, and way less at any other of the numerous crags... Not exactly overrun :) As the fool with a chainsaw cutting sprung alders for miles, I think a fix and ongoing maintenance would be a big help as it has been in previous years. Take a walk up past Exfo Dome. In 2001 I rode my mountain bike to Deer Creek Pass. It is now nearly impassable. That's what lies ahead if the road is closed.

 

Affected crag areas (for those not knowing)are Green Giant Buttress, Chrome Dome, Wawetkin Dome, The Comb, 3:00 Rock, Exfoliation Dome and Blueberry Hill, Baloney Dome, and 8 mile Trail. Overall, hundreds of wonderful climbs

 

I'll call the FS to get some contacts

 

 

MH

Edited by hanman
Link to comment
Share on other sites

I spoke with Jim Mitchell at the Sedro Wooley FS office. He is the roads manager for the north district. He was very helpful and took quite a bit of time to explain the issue at hand. Essentially, there are two flood events (one in December, and the recent MLK event) that are open to Federal submittal for flood subsidy $$. The December flood has been declared a state emergency by the Governor, and he felt that the MLK event would also be declared in time. The timeline for this type of funding approval for flood repairs may be up to 2 years.

 

If the FS tried to repair under their current budget rather than flood subsidy, this ONE slide would amount to roughly 30% of their operating budget. The wash in the above photos is expected to cost 30K$ on the low end. Further up the road there is another trough which is reported to be wider and deeper.

 

As expected, their repair budgets are non existent, and this winter's toll includes many large similar problems.Jim did say that he was very aware of the Clear Creek/DTown user group from the 04 letter campaign, and that they understood the importance of continued access.

 

I did let him know that the interest is high, and that we (climbers) would offer to assist in any appropriate volunteer effort that would help to defray the substantial cost expected.

 

 

Guess we'll have to see what shakes out...

 

Honda Trail 90 repair program to commence this w/e :)

 

 

MH

 

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.




×
×
  • Create New...