Jump to content

Hood Canal Bridge Work


Dave_Schuldt

Recommended Posts

Take note!!!!

Work has started on renovation, and this Thursday at 8 PM, the bridge will be closed until Monday night.  Don't get stuck.  Driving through Belfair or Shelton, is expected to be bad.  Only car ferry is from Port Townsend, and it is small.  Next closure is August 21, Sunday, at 8 PM.  Not sure on length of second.

Link to comment
Share on other sites

  • Replies 4
  • Created
  • Last Reply

Top Posters In This Topic

If you have to be in P.T. early in the day, as I do, you can take the Mukilteo/Clinton ferry, then drive up Whidbey to the Keystone/P.T. ferry. Though this sounds like a pain, it is not that much more time consuming than taking the regular Edmonds ferry. I usually take the 6:30 boat to get to P.T. by 8:00 but on Saturday I will have to catch the 6:00 in Mukilteo instead.

Link to comment
Share on other sites

  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.




×
×
  • Create New...